On the sprawling construction site of the long-awaited Dominica International Airport in the Wesley community, crews are accelerating work on one of the project’s most critical structural components: the dedicated under-runway tunnel that will preserve surface road access between Wesley and nearby Woodford Hill once the full runway is operational. On-site project management teams confirm that skilled work crews are currently executing multiple parallel workstreams for the tunnel buildout, including placing precision-cut steel reinforcement bars, erecting custom formwork for upcoming concrete pours, installing full scaffolding access systems, and prefabricating structural elements that will feed into subsequent construction phases. The purpose-built tunnel is engineered to eliminate disruptions to local inter-community travel that would otherwise be created by the new airport’s runway footprint, ensuring no long-term breaks in existing local transportation links. During his official November 3 Independence Day national address, Dominica Prime Minister Roosevelt Skerrit reaffirmed that the entire airport development is adhering strictly to its pre-set timeline, with full completion targeted for the first quarter of 2028. He also highlighted that more than 400 local Dominican workers are currently in direct full-time employment on the project site, delivering tangible economic benefits to local households even before the facility opens. The Dominican government has framed the multi-million-dollar airport as a transformative national strategic infrastructure investment, designed to unlock long-term growth by vastly improving the island’s international air connectivity, cutting logistics costs for local agricultural exporters, driving sustained expansion in the country’s tourism sector, and attracting new foreign and domestic direct investment that will create thousands of additional jobs in associated industries. Construction activity is currently advancing simultaneously across multiple zones of the 300+ acre development, with the underpass tunnel forming a non-negotiable piece of the foundational supporting infrastructure required for the airport to receive commercial international passenger and cargo flights upon its commissioning.
Construction advances on tunnel works at Dominica’s international airport project
