Linden gets back-up generator for water supply during blackouts

On the evening of Tuesday, November 3, 2026, Guyana’s Ministry of Public Utilities formally announced the successful deployment of a new 750-kilovolt-ampere (kVA) backup generator at Linden’s West Watooka Water Treatment Plant, a critical intervention designed to unbroken potable water access for local residents during unplanned power outages. The heavy-duty unit was offloaded in Linden earlier that day, replacing an older, less reliable backup system at the facility to drastically boost the plant’s operational resilience amid widespread, recurring electricity disruptions across the region. The targeted rollout follows a high-level coordinated engagement earlier that same Tuesday, which brought together senior public utility officials, regional administration representatives, and leadership from Linden’s two local power suppliers: Linden Electricity Company Incorporated (LECI), which serves the Mackenzie district, and Linden Utility Services Co-operative Society Limited (LUSCSL), the provider covering Wismar). During the meeting, Public Utilities Minister Deodat Indar issued a formal directive to the Ministry’s Director-General Alfonso De Armas to oversee end-to-end logistics for the generator’s rapid installation, commissioning, and integration with the water treatment plant’s core operations. On-site supervision for the deployment was led by Guyana Water Incorporated (GWI) Executive Director of Projects Marlon Daniels and Director of Operations Jawaharlal Ramjug, who coordinated cross-functional technical teams to ensure the unit would be fully operational at the earliest possible timeline. Beyond the immediate generator replacement, Director-General De Armas was tasked with rolling out a broader, system-wide upgrade mandate that requires every water treatment facility across the entire Linden region to be fitted with dedicated backup power systems. The sweeping policy is intended to minimize service disruptions to potable water production and distribution even during extended grid outages, as local electricity providers work to resolve longstanding underlying power supply challenges. The urgent intervention came just 24 hours after hundreds of Linden residents staged public protests to voice frustration over frequent, multi-hour blackouts that had repeatedly cut off access to running water for households, businesses, and public facilities across the community. While the new backup generator addresses the immediate knock-on impact of power failures on water services, opposition parliamentarian Sharma Solomon from the A Partnership for National Unity (APNU) party emphasized that short-term fixes are insufficient to resolve Linden’s systemic electricity crisis. Solomon called on the national government to allocate long-term capital investment to deploy a 100-megawatt local generation system and conduct full upgrades to Linden’s aging transmission and distribution network, noting that the expanded, modernized power capacity would not only eliminate routine blackouts but also support planned future growth for residential housing developments, public infrastructure projects, and local commercial operations.