Same-day surgeries start at Couva Children’s Hospital

In a significant healthcare development, Trinidad and Tobago’s long-dormant Couva Children’s Hospital commenced same-day surgical procedures on November 28th, marking the initial phase of its operational activation. Health Minister Dr. Lackram Bodoe confirmed the milestone following an inspection at the facility, revealing that the inaugural surgeries targeted patients from waiting lists across all regional health authorities.

The surgical interventions specifically addressed renal dialysis patients requiring arteriovenous shunts and individuals with severe venous leg conditions needing radio frequency ablation procedures. Minister Bodoe indicated that specialized pediatric outpatient clinics would represent the next service category to become operational, though no precise timeline was provided beyond ‘the near future.’

This activation aligns with Prime Minister Keith Rowley’s mandate, with the Health Ministry emphasizing its commitment to a ‘smooth, well-coordinated transition’ as additional services gradually come online. However, questions regarding full operationalization timelines remain unanswered, as decisions pending include which regional health authority will ultimately assume management responsibilities.

The hospital’s activation occurs against a backdrop of substantial surgical backlogs, with a September Udecott report documenting approximately 11,300 citizens awaiting procedures nationwide—primarily in ophthalmology and general surgery.

Despite progress, the initiative faces staffing challenges. Trinidad and Tobago National Nurses’ Association president Idi Stuart recently opposed the opening plans, citing insufficient nursing personnel. Minister Bodoe acknowledged these concerns, confirming ongoing efforts to resolve staffing deficiencies.

Originally constructed and opened by the People’s Partnership administration in August 2015, the facility remained largely non-operational during the PNM’s subsequent decade-long administration. Current renovation activities were visible during a November 28th site visit, with workers repainting buildings and removing previous signage while maintaining the Ministry of Health’s identification.