Antigua’s Minister of Utilities Melford Nicholas has laid out a groundbreaking dual-purpose infrastructure proposal that would transform the Potworks Dam reservoir into a combined water storage and large-scale renewable energy hub, addressing two of the nation’s most pressing resource constraints simultaneously. Speaking during a November 10 appearance on Pointe FM’s *Taking Stock* broadcast, Nicholas detailed a custom-engineered design that would mount rows of solar photovoltaic panels on elevated stilts across the 320-acre dam basin, including sections adjacent to the structure’s southern spillway. The elevated mounting framework ensures the entire area beneath the panels remains fully integrated as functional reservoir space, unlocking a secondary high-value use for the existing impoundment without requiring the conversion of scarce terrestrial land that has long blocked plans for utility-scale solar development on the small island state. Beyond expanding clean energy generation, the shaded coverage provided by the overhead solar arrays will drastically reduce direct solar radiation hitting the reservoir’s surface, cutting significant volumes of water loss through evaporation that otherwise erodes stored freshwater supplies, particularly during Antigua’s drier seasonal periods. The Potworks Dam solar scheme is the centerpiece of a broader 55-megawatt solar and battery storage initiative that Nicholas is pushing the Antigua Public Utilities Authority (APUA) to advance, as part of a national strategy to slash costly reliance on imported fossil fuels that currently dominate the country’s electricity generation mix. Nicholas confirmed that technical teams will now conduct a full feasibility assessment, including rigorous analysis of engineering specifications, total capital expenditure, and long-term operational returns, before the formal proposal is submitted to the Antiguan Cabinet for final sign-off. The minister also openly acknowledged outstanding public questions regarding the current structural condition of the dam basin, noting that a targeted geological survey will be commissioned to evaluate whether accumulated sediment in the reservoir can be safely removed without compromising the impermeable liner that prevents stored freshwater from seeping through the porous limestone bedrock beneath the basin. No final detailed engineering blueprints, quantified projections for evaporation reduction rates, or targeted groundbreaking timeline for the project have been released to date, as pre-development assessment work remains in its early stages.
Solar panels proposed for Potworks Dam could generate power and reduce water loss
