Raccoon Street HQ Refurbishment Officially Gets Underway

After years of unaddressed structural issues, broken promises to upgrade, and persistent health hazards, the long-awaited major refurbishment of the Raccoon Street Police Station has officially broken ground. The project, which aims to completely transform the aging, deteriorating facility, is now in its first phase, according to Home Affairs Minister Julius Espat. The core goal of the renovation is to deliver far safer, healthier working conditions for the law enforcement officers stationed there, as well as better public service spaces for community members that interact with the department.

Speaking on the start of the work, Espat explained that the building had been neglected for far too long, and the scope of the project carries a significant price tag. The government has repurposed unused allocated funding from the Ministry of Infrastructure’s annual budget for government building maintenance to launch the first phase of work. Crews are currently focused on replacing and refurbishing the station’s failing roof, a critical first step to stop ongoing water intrusion that has caused widespread damage. After roof work is complete, the project will move forward with planned exterior cladding designed to better withstand heavy rainfall and prevent future moisture damage. Once exterior work is finished, crews will move indoors to address severe structural and health hazards that have left the building unfit for long-term occupancy: toxic mold growth that has already been linked to illness among personnel, alongside widespread deterioration across interior spaces.

The push for a full overhaul of the station gained urgent public attention in 2025, when a viral video circulating on social media captured extensive rainwater flooding throughout the station building. At that time, then-Home Affairs Minister Kareem Musa publicly confirmed that incremental, quick patchwork repairs were no longer sufficient to fix the facility’s problems, and that a complete top-to-bottom renovation was the only solution. This report is adapted from a transcribed broadcast of an evening television newscast.