Traffic flow changes expected as work ramps up on Naggo Head to Braeton road project

KINGSTON, Jamaica—Significant traffic modifications are imminent as Jamaica’s National Works Agency (NWA) accelerates its ambitious Naggo Head to Braeton roadway enhancement initiative in St Catherine. This critical infrastructure development, valued at approximately $2 billion, forms an integral component of the Government’s Capital Expenditure (CAPEX) programme aimed at urban transportation modernization.

Stephen Shaw, Manager of Communications and Customer Relations at NWA, recently confirmed the project’s progression in discussions with JIS News. Construction activities are being substantially intensified along the three-kilometer corridor stretching from Naggo Head to the junction of Braeton and Hellshire Road, ultimately connecting to Greater Portmore. The NWA pledges to issue timely advisories to Portmore residents and commuters regarding impending traffic flow alterations, enabling necessary adjustments to travel schedules and routes.

Upon completion, the transformed corridor will feature a modern four-lane configuration with raised medians, synchronized traffic signaling systems, and comprehensive safety enhancements including adequate sidewalks. The project incorporates sophisticated drainage solutions and water line installations alongside dedicated ducts for fiber-optic cables, aligning with Jamaica’s National Broadband Initiative for digital infrastructure expansion.

The CAPEX programme represents a strategic infrastructure investment framework designed to stimulate short to medium-term economic growth through targeted urban transportation improvements. Six major projects currently fall under this initiative: Grange Lane widening (St Catherine); Braeton Road and Hellshire main road dualisation (St Catherine); Arthur Wint Drive widening (St Andrew); East Kings House Road and Lady Musgrave Road widening (St Andrew); Sandy Gully Bridge enhancement along Washington Boulevard (Kingston); and improved access to Portmore via Mandela Highway and Municipal Boulevard (St Catherine).

Concurrently, the NWA anticipates concluding the Southern Coastal Highway Improvement Project by March end, initiating a two-year defects liability period wherein contractors will address any construction-related issues. This multibillion-dollar infrastructure development spans St Andrew, St Thomas, and Portland parishes, incorporating comprehensive flood mitigation measures, roadway expansions, and safety feature installations.