Amid swirling unsubstantiated claims across Barbadian social media platforms that the Barbados Water Authority (BWA) had dug up a recently resurfaced stretch of asphalt road in the Cattlewash, St Joseph, neighborhood to install new water infrastructure, the state-run utility has released an official public statement to set the record straight. The Friday public communique from the BWA explicitly refuted the viral allegation that any newly laid asphalt was damaged or torn up during the utility’s recent on-site works. According to the agency’s documented timeline, a dedicated coordination meeting with contracted construction partners was convened on November 10 to assess the condition of a long-standing 2-inch water main that runs through the Cattlewash area. During that assessment, engineering teams determined the existing pipeline was positioned unacceptably close to the ground surface, creating a high risk of future damage from regular vehicle traffic and seasonal coastal weather events. To mitigate that long-term vulnerability, the BWA approved a targeted project to install a new, properly buried water main at a significantly lower, more structurally sound depth. Excavation for the project launched on November 14, and all associated trenching and pipe-laying work was fully wrapped up by the end of day Friday, the same day the statement was released. BWA leadership emphasized that the entire stretch of ground where excavation took place had never been paved with asphalt at any point prior to the project, meaning no newly laid road surface was disturbed, damaged, or destroyed during the utility’s infrastructure upgrade.
