Bellefield High sets sights on ending shift system

MANDEVILLE, Manchester — Bellefield High School is making significant strides toward eliminating its shift system, a long-standing challenge for the institution. The recent inauguration of an eight-classroom block, constructed at a cost of $75 million through independent funding, marks a pivotal step in this journey. Principal Paul Grant emphasized the need for an additional 16 classrooms to fully transition to a whole-day operation mode for its 1,400 students.